Garage ADU Conversion Services Designed for Rental and Residential Use


Why Antelope Homeowners Choose Burnette Construction for Garage ADU Conversions
- 5+ years of licensed garage ADU conversion experience serving Antelope, CA and Sacramento County
- Local contractor with hands-on knowledge of Antelope City and Sacramento County plan check requirements
- Fully licensed, insured, and California Building Code-compliant ADU construction team
- Title 24 energy compliance integrated into every garage conversion project from the start
- Clear written scopes, transparent pricing, and defined construction milestones
- Coordinated in-house trades for efficient, organized conversion timelines
- Professional project management from permit approval through final inspection sign-off
Why Garage ADU Conversion Requires More Than a Basic Remodel
- Permitting accuracy matters because incomplete or incorrectly prepared plans trigger plan-check correction cycles that add months to your project timeline.
- Structural integrity issues are common in existing garages, which often require framing upgrades, shear wall additions, or header reinforcement to meet habitable space standards.
- Energy compliance under Title 24 requires insulation, HVAC systems, lighting, and windows to meet current California energy standards, which are specific to ADU conversions and not standard remodel requirements.
- Ventilation and moisture control are critical because most garage slabs have moisture migration issues and limited natural airflow that must be resolved before the space is enclosed and finished.
- MEP coordination requires electrical, plumbing, and HVAC systems to be designed as an integrated system, not added one at a time after construction begins.
- Rental readiness depends on privacy features, sound control between units, and durable finishes that hold up over years of occupancy, not months.

Garage ADU Conversion Services in Antelope, CA

Garage to Bedroom Conversion

Garage to Living Space Conversion

Studio ADU Garage Conversion

Full Garage ADU Conversion

Junior ADU Garage Conversion

Two-Story ADU Garage Conversion

ADU Garage Conversion Design and Plans
Our Step-by-Step
Garage Conversion ADU Process
01
Initial Consultation and Feasibility Review
We assess your garage dimensions, slab condition, existing utilities, and zoning status to determine the most viable conversion scope for your property.
02
ADU versus JADU Determination and Scope Definition
We confirm whether a full ADU or Junior ADU best fits your property and goals, then define a clear construction scope based on those findings.
03
Design, Engineering, and Energy Compliance
Architectural drawings, structural engineering documents, and Title 24 energy compliance packages are prepared to meet all applicable requirements.
04
Permit Submittal and Plan Check
Complete plan sets are submitted to your jurisdiction. Burnette Construction manages the review process and responds to any correction notices to minimize delays.
05
Construction and Trade Coordination
Structural upgrades, insulation, framing, drywall, electrical, plumbing, HVAC, and interior finishes are completed in coordinated phases aligned with inspection requirements.
06
Inspections and Final Sign-Off
Each phase is inspected by the building department. Burnette Construction manages all inspection scheduling and final occupancy sign-off.
07
Project Closeout and Handover
We complete the project walkthrough, provide all documentation and warranties, and deliver your completed garage ADU ready for occupancy.
Garage Conversion ADU Service Areas
- Citrus Heights
- Davis
- Rocklin
- Lincoln
- Land Park
- Antelope
- Sacramento City
- Rancho Cordova
- Roseville
- Folsom