Multi-Story ADU Construction in Antelope, CA


Why Two-Story ADU Construction Requires Its Own Approach
Multi-Story ADU Construction Services We Offer

Two-Story Detached ADU Construction

Over-Garage Second-Story ADU Addition

Two-Story Attached ADU Wing Construction

Multi-Story ADU Foundation and Structural Engineering

Second-Floor Staircase and Interior Egress Design

Multi-Story ADU Exterior Shell and Roofline

Two-Story ADU Plumbing and Electrical Systems

Multi-Story ADU Fire Separation & Safety Code Work
Our Straightforward Kitchen Renovation Steps
01
Free Site Evaluation
We visit your property in Antelope or the surrounding area. We look at your lot size, setbacks, existing structures, and soil type. Next, we talk through your goals and tell you what type of multi-story ADU fits your property.
02
Structural Feasibility and Engineering Review
We bring in a licensed structural engineer to review your site. The engineer confirms the soil can support a two-story structure. Also, the engineer designs the foundation and calculates the floor-to-floor load requirements.
03
Permit Package Preparation and County Submittal
We prepare the full permit package. This includes architectural plans, structural engineering plans, Title 24 energy compliance, and the geotechnical report. Then we submit the package to Sacramento County Building Division through the EPIC Online portal.
04
Site Preparation and Foundation Work
We clear and grade the building site. Next, we excavate for the footings, set the rebar, and pour the foundation. We schedule the foundation inspection with Sacramento County before framing begins.
05
Structural Framing and Rough-In Systems
We frame the first floor, then the second floor. Next, we run the plumbing stack, electrical wiring, and HVAC ductwork. We also install fire blocking and the staircase framing. Then we schedule rough-in inspections with the county.
06
Exterior Shell and Interior Rough Finishes
We install the roofing, weather barrier, siding, windows, and doors. Next, we hang insulation and fire-rated drywall. Then we install the interior staircase, finishes, fixtures, and appliances on both floors.
07
Final Inspection and Project Handover
We schedule the final Sacramento County inspection. Once the ADU passes, we walk through both floors with you. We go over every room and system before we hand over the keys.
Where We Build Multi-Story ADUs Across Sacramento County
- Citrus Heights
- Davis
- Rocklin
- Lincoln
- Land Park
- Natomas
- Antelope
- Sacramento City
- Rancho Cordova
- Roseville
- Folsom
- Carmichael